HIA Jet A1 Supply Project
The HIA Jet A1 Supply Project
shall provide an additional supply of Jet A1 fuel from Ras Laffan Industrial
City (RLIC) to Hamad International Airport (HIA). The Project consists mainly
of tie-ins, 28” Import pipeline, tank farm and pumping facilities at new Jet
Fuel Tank Farm (JFTF) Area within RLIC, approximately 132 km 24” pipeline, metering
and tie-in station at HIA.
Services provided
- Preparation of Pre-Commissioning and Commissioning Plan
- Preparation of General Sequence
of Commissioning
- Preparation of Schedule of Pre-Commissioning
and Commissioning Documents
- Preparation of list of Engineering/Vendor documents required for
Operation Manual
Key data
- Demand for Jet A-1 fuel is
projected to increase from its current 30,000 barrels/day, potentially rising to
more than 190,000 barrels/day by 2030.
- Tie-in to upstream facilities
at LRTF, length 2.5 km
- Tie-in to upstream facilities
at PGTL, length 1.3 km
- New Jet A1 Manifold Station
(JA1MS)
- 28” Import Pipeline to JFTF,
length 8.3 km
- New Jet fuel Tank Farm (JFTF)
- 24” Export Pipeline to C2
Station, length 132 km
- 4 Sectional Block Valve
Stations
- New Station C2
Time period: 2017-2018