Oil and Gas

Mina Al AhmadiCommon Seawater SupplySOKHNA TERMINALTrans Adriatic PipelineHIA Jet A1 Supply Project

Water Supply

TAIF-TURUBAHSWSR LiwaFWTS2

Thermal Power Plants

INA TA 341-TA-004AO-WHR-ORCCCPP BLOCK EL-TOBE-TO OsijekBE-TO SisakWHR Plant KronospanCHP Plant EL-TOCHP Plant PlockSteam desuperheatersCHP plant InowroclawCHP plant JanikowoThe Circle at Zürich AirportGKA Werndorf

Process Plants

PB1502/PD1502Hand wheel actuatorBIOLYSCBDCAUTOBAHNCHUQUICAMATA

Waste incineration

Spittelau Vienna

WWTP

WWTP Gas Station JakovljeWWTP KninAERATION EQUIPMENT DESIGN

Carbon Black & Delayed Coker Project (CBDC)

Construction of a Coke Calcination Unit to produce UV carbon black coke,  semi-conductive black coke, calcined coke, using slurry oil and vacuum residue from Ruwais refinery as feedstock.

 

Services provided:
  • PDMS modelling of equipment according to vendor drawings (pumps, heat exchangers, various tanks, mixer, Gillotin damper, various fans and other equipment on the project),
  • Checking of vendor drawings and recommending required modifications
  • Checking of P&ID's and recommending required modifications
  • PDMS piping and HVAC design
  • PDMS design of civil infrastructure to accommodate facility (building walls, steel structures and others as required)
  • Preparation of General Arrangement drawings,
  • Preparation of Piping Arrangement drawings,
  • Preparation of HVAC isometrics
 

Key data:
  • Green Coke Receiving, Sizing, Storage and Handling
  • Calcination by means of two Calciner Lines with a feed capacity of 2 x 350.000 tpy at 347 dpy
  • Calcined Coke Handling, Dedusting, Storage, Handling and Ship Loading
  • Steam generation for refinery network
  • Flue Gas Treatment
  • Utility Systems
 
Time period: 2014