Basin 3 Liquid Bulk Terminal at Sokhna Port (Egypt)
Construction of a world-scale petrochemical and liquefied gas tank terminal in harbor area of Ain-Aokhna (Egypt). This terminal will serve as the main supply to the Egyptian network for gasoil & LPG.
Services provided:
- 3D planning of LPG system (Autodesk Plant 3D)
- 3D planning of Sea Water Supply system (Autodesk Plant 3D)
- 3D planning of Fire Foam system (Autodesk Plant 3D)
- 3D planning of Fire Water system (Autodesk Plant 3D)
- 3D planning of Potable Water system (Autodesk Plant 3D)
- 3D planning of Plant Air, Instrument Air and Nitrogen System (Autodesk Plant 3D)
- Checking of vendor drawings and recommending required modifications
- Checking of P&ID's and recommending required modifications
- Modelling of equipment according to vendor drawings (pumps, various tanks and other equipment on the project)
Key data:
- Three (3) oil tanks, with a total capacity of 100 000 m3
- Three (3) liquefied petroleum gas (LPG) tanks, with a total capacity of 150 000 m3
- 4.3 km LPG pipeline
- 37.5 km gas oil pipeline connecting to the national grid through Mina Sadat
- Floating storage and regasification unit, with a storage capacity of 170 000 m3
- Related infrastructure
Time period: ongoing, from 2016 onwards