CHUQUICAMATA
The Codelco copper mine Mina Ministro Halles in Chuquicamata will be expanded by a new roasting plant and a sulfuric acid plant. For this purpose a new turnkey construction of a two-lined gas washing and cooling system is foreseen.
Services provided:
- Checking of P&ID's and recommending required modifications
- Checking of vendor drawings and recommending required modifications
- 3D modelling of equipment according to vendor drawings (pumps and other associated equipment)
- 3D planning of piping, piping supports and secondary steel selection (PDMS)
- Preparation of general arrangement drawings (PDMS)
- Preparation of piping isometrics (PDMS)
- Preparation of Material take off (MTO)
- Preparation of drawings for special piping parts (AutoCAD)
- Preparation of piping supports drawings (PDMS/AutoCAD)
Key data:
- 2 (two) lines, each containing 1 (one) Quench tower with 1 (one) 2nd stage WESP
- 2 (two) flushing pumps for WESP, 1 (one) for each line
- 6 (six) circulation pumps, 3 (three) for each line
- Filter-flushing system, Fogging system and Air scavenging system
- Associated Piping for recirculation pumps and flushing pumps
Time period: ongoing, from 2017. onwards